A general method in statistics to get estimates that maximize the likelihood, i.e. adjust the estimates to maximize the probability attributed to the data that you actually have.
Many platforms in JMP already use maximum likelihood. If your problem doesn't fitunder this you might try
Analyze: Nonlinear Fit specifying as a loss function one that is a negative log-likelihood.